By clothing-bag, 16/10/2022

The port of Huelva builds a multifunctional building on the southern dock for passenger and services terminal |Haonomia.es - Huelva Economic and Business Information

The port of Huelva is building a multifunctional building in the South Mulle, which will host a terminal for shipping and landing for passengers, as well as spaces to house port services and police and customs control and inspection services.

The multifunctional building, which will compose three floors, will occupy a total area greater than 2.300 square meters on the esplanade of the South spring next to the existing ro-ro ramp, where the ferry ships that connect Huelva with the Canary Islands do.The works have a budget of 6.1 million euros and they are scheduled to end in summer of 2022.

The president of the port of Huelva, Pilar Miranda, has assured that “the implementation of this multifunctional building is part of the qualitative improvement that the Port Authority of Huelva is developing within the existing infrastructure in the service area of the South Pier,To make this logistics node a key element of reference for intermodal transport, with continuous growth prospects ”.

This space will develop security functions, telecommunications, passage control and port management.Therefore, the new facilities will house access controls for National Police and Civil Guard, Passage Controls and Customs Office.In addition, different waiting areas for passengers, cafeteria, information point, check in and ticket sale will be installed, as well as several offices for the management of shipping companies that operate the different regular lines connected to the southern dock of the port of Huelva.

El Puerto de Huelva construye un edificio multifuncional en el Muelle Sur para terminal de pasajeros y servicios | Heconomia.es - Información económica y empresarial de Huelva

The works, which advance at a good pace, are being carried out by the Conacon company.The foundation and structure of the building, the forged and covered, has already been executed, and the enclosures and the facilities are being carried out.

The design will be defined by its unique and innovative character, having a large cantilever that will form the main access of passengers, as well as an extensive plant surface that will cover the entire top.

The recent growth in filming, ro-ro load traffic, and passengers of recent years makes it necessary to build a multifunctional building for the management of the shipment and landing of passengers, as well as to house the port and control services and control and control servicesPolice and Customs Inspection.Therefore, the construction of a multifunctional building that serves as a passenger terminal and a parking lot annexed to the building.

Tags: